Smart India Hackathon, SIH 26002

The North East moves on a handful of roads. We keep them navigable.

Margdarshak watches rainfall, river gauges, slope stability and road condition across all eight states, then routes citizens, drivers, logistics operators and rescue teams around whatever has just closed.

Corridors monitored
20
Segments closed
3
Segments under caution
10
Districts scored
10
Regional picture
9 active
Strategic road corridors of the North Eastern Region with current condition of each segmentBrahmaputra embankment breach at Jonai, DhemajiSlope failure closes NH-306 at Kawnpui, KolasibBoulder fall blocks the Sonapur stretch of NH-6, Ri BhoiRed rainfall warning for the Khasi and Jaintia hills, East Khasi HillsTeesta undercuts the river side lane of NH-10, PakyongBarak river crosses the danger mark at Annapurna Ghat, CacharMagnitude 4.6 tremor west of Tamenglong, TamenglongPier scour above threshold on the Barak crossing, NoneyDense fog on the Bongaigaon bypass, BongaigaonSiliguriGangtokAgartalaGuwahatiShillongAizawlSilcharItanagarDimapurImphalKohima
  • Open
  • Caution
  • Closed
  • Active incident
1,56,440 people in affected areas

Live

  • CriticalBrahmaputra embankment breach at JonaiDhemaji, 38 min ago
  • CriticalSlope failure closes NH-306 at KawnpuiKolasib, 2 hr 12 min ago
  • CriticalBoulder fall blocks the Sonapur stretch of NH-6Ri Bhoi, 3 hr 41 min ago
  • HighRed rainfall warning for the Khasi and Jaintia hillsEast Khasi Hills, 1 hr 14 min ago
  • HighTeesta undercuts the river side lane of NH-10Pakyong, 9 hr 5 min ago
  • HighBarak river crosses the danger mark at Annapurna GhatCachar, 1 hr 36 min ago
  • ModerateMagnitude 4.6 tremor west of TamenglongTamenglong, 4 hr 28 min ago
  • ModeratePier scour above threshold on the Barak crossingNoney, 11 hr 30 min ago
  • LowDense fog on the Bongaigaon bypassBongaigaon, 26 min ago

The problem

A generic navigation app cannot help here

Routing that only knows about traffic is useless in a region where the constraint is whether the road still exists. Four conditions make the North East a distinct problem rather than a harder version of an ordinary one.

Connectivity runs on single threads

Almost everything entering the region passes through the Siliguri corridor, and Mizoram is served by one surface link through Silchar. When a single segment closes, a whole state loses its supply line rather than one lane of traffic.

Rainfall arrives in extremes

The southern slopes of Meghalaya record some of the heaviest rainfall measured anywhere. Saturation builds across hill cut sections faster than clearance crews can work, and the Brahmaputra and Barak respond within hours.

The whole region sits in seismic zone five

The highest hazard band in the country covers most of the eight states. Tremors weaken cut slopes and bridge piers quietly, so the damage often shows up as a road failure days after the event itself.

Detours are hundreds of kilometres, not minutes

In the hills the next alternative is rarely nearby. A closure at Sonapur pushes Barak valley freight onto an approach through Nagaland and Manipur, adding most of a day to a journey that normally takes five hours.

Capabilities

Seven parts, one operating picture

Each capability is built and clickable in this prototype. Every one runs on simulated regional data rather than a live agency feed.

01

Live disaster and road condition monitoring

Rainfall, river gauges, seismic events, slope reports and field observations land in one feed, each tied to the corridor segment it actually affects.

Open live alerts
02

Emergency SOS

One button captures location, emergency type, how many people are involved and what is needed, then puts it straight into the response queue.

See the SOS flow
03

Alternative routes during disasters

A weighted shortest path runs over the live corridor graph, so a closure at one slope immediately produces the fastest and the lowest risk way around it.

Plan a route
04

Emergency information sharing

Every raised emergency carries the detail a rescue team needs on arrival: access route, nearest landmark, people affected and the hazard already on the ground.

See what gets shared
05

Logistics and vehicle tracking

Relief trucks, ambulances, fuel tankers and response convoys are tracked against their corridor, with exposure flagged when the road ahead degrades.

Track the fleet
06

Risk analysis by district

Rainfall, river level, slope instability, seismic activity and historical incident density combine into a district score with a seven day outlook.

Read the analysis
07

A console built for a control room

The regional picture, the incident queue, the fleet and the risk ranking on one screen, laid out for someone making dispatch decisions under time pressure.

Open the console

How it works

From a gauge reading to a dispatch decision

The platform is a loop rather than a dashboard. Every signal changes the weight of a road segment, and every changed weight changes the route the next person is given.

  1. Sense

    Signals land against a segment, not a region

    A gauge reading, a rainfall warning, a tremor or a citizen report is attached to the specific stretch of highway it affects. A warning for East Khasi Hills becomes a condition on the Guwahati to Shillong climb and the Shillong to Silchar section.

  2. Score

    The model weighs terrain against the signal

    The same hundred millimetres of rain means something different on the plains than on a hill cut section above a river. Rainfall, river level, slope, seismic activity and past incident density combine into a district score and a per segment risk value.

  3. Route

    The network is solved again with the new weights

    Closures are removed from the graph and cautioned segments are made expensive. A shortest path runs three times over the same network with different weightings, which is what produces a fastest option and a lowest risk option side by side.

  4. Respond

    The picture and the dispatch stay in one place

    Emergencies raised from the SOS flow enter the same console that holds the map, the fleet and the risk ranking, with the access detail a rescue team needs before it leaves.

Coverage

The corridors the region actually depends on

Twenty national highway segments connecting sixteen centres across the eight states, positioned by their real coordinates. Each segment carries a live condition, a terrain class and the hazard currently acting on it.

Strategic road corridors of the North Eastern Region with current condition of each segmentBrahmaputra embankment breach at Jonai, DhemajiSlope failure closes NH-306 at Kawnpui, KolasibBoulder fall blocks the Sonapur stretch of NH-6, Ri BhoiRed rainfall warning for the Khasi and Jaintia hills, East Khasi HillsTeesta undercuts the river side lane of NH-10, PakyongBarak river crosses the danger mark at Annapurna Ghat, CacharMagnitude 4.6 tremor west of Tamenglong, TamenglongPier scour above threshold on the Barak crossing, NoneyDense fog on the Bongaigaon bypass, BongaigaonSiliguriGangtokTuraAgartalaGuwahatiShillongAizawlSilcharTezpurItanagarDimapurImphalKohimaJorhatDibrugarhPasighat
  • Open
  • Caution
  • Closed
  • Active incident
  • Arunachal Pradesh
  • Assam
  • Manipur
  • Meghalaya
  • Mizoram
  • Nagaland
  • Sikkim
  • Tripura

Segments on the watchlist

Everything currently closed or degraded, in the order the routing engine penalises it.

  • NH-10

    Closed

    Siliguri to Gangtok, 114 km

    Teesta has scoured the river side lane above Rangpo. Movement suspended pending geotechnical clearance.

  • NH-27

    Caution

    Siliguri to Guwahati, 440 km

    Dense morning fog around the Bongaigaon bypass. Visibility under fifty metres before 09:00.

  • NH-6

    Closed

    Shillong to Silchar, 240 km

    Slope failure at Sonapur has taken both lanes. Clearance plant on site, hill face still shedding.

  • NH-217

    Caution

    Guwahati to Tura, 220 km

    Backwater from the Jinjiram is over the shoulder in three places between Phulbari and Tura.

  • NH-415

    Caution

    Tezpur to Itanagar, 130 km

    Continuous rainfall on the foothill climb. Surface water and occasional stone fall reported.

  • NH-715

    Caution

    Tezpur to Jorhat, 150 km

    Sheet water across the Kaziranga boundary stretch. High clearance vehicles only, heavy animal crossing at dusk.

Who it serves

Four groups, one shared picture

Citizens

Is my route home safe, and how do I reach help if it is not

A plain reading of what is closed nearby and an SOS that carries location and access detail to the response queue.

Drivers

The road I use every day just closed

The fastest open alignment and the lowest risk one, with each segment on the way flagged for what it is doing right now.

Logistics operators

Where is my consignment and what is it about to run into

Vehicle level tracking against the corridor, with exposure raised the moment a segment ahead degrades.

Rescue teams

Who needs us, where exactly, and how do we get in

A queue of raised emergencies with landmark, people affected, hazard on the ground and the access route that is still open.

Open the console and work through a live monsoon week

Three segments are closed, six are degraded and two vehicles are held. Every screen is built, connected and driven by the same simulated dataset.

Made with Modulify