MARGDARSHAKDisaster aware mobility
SOS

Operations console

One picture of what has happened, what is closed, who has asked for help and where the fleet is right now.

All sources reportingPlan a route

Active incidents

9

3 critical

Corridor segments closed

3

10 more under caution

Emergencies awaiting dispatch

0

6 in the queue

Vehicles held on route

2

9 moving or held

Districts at critical risk

3

of 10 scored

2 centres are cut off from the network

No open surface route reaches Gangtok or Aizawl from Guwahati. Movement to these centres needs air or water support until the blocking segments are cleared.

Check alternatives

Regional picture

Corridor condition with every active incident plotted against the segment it affects.

20 segments
Strategic road corridors of the North Eastern Region with current condition of each segmentBrahmaputra embankment breach at Jonai, DhemajiSlope failure closes NH-306 at Kawnpui, KolasibBoulder fall blocks the Sonapur stretch of NH-6, Ri BhoiRed rainfall warning for the Khasi and Jaintia hills, East Khasi HillsTeesta undercuts the river side lane of NH-10, PakyongBarak river crosses the danger mark at Annapurna Ghat, CacharMagnitude 4.6 tremor west of Tamenglong, TamenglongPier scour above threshold on the Barak crossing, NoneyDense fog on the Bongaigaon bypass, BongaigaonSiliguriGangtokTuraAgartalaGuwahatiShillongAizawlSilcharTezpurItanagarDimapurImphalKohimaJorhatDibrugarhPasighat
  • Open
  • Caution
  • Closed
  • Active incident

Emergency queue

Raised through the SOS channel, newest first.

Criticalteam_assignedFlood2 hr 35 min ago

Jonai Bazar Ward 4

DhemajiAssam

Embankment breached overnight. Water is chest deep on the approach lane and still rising. Families moved onto rooftops, four of them elderly and unable to wade out.

AccessBehind the old jute mill, embankment side

People involved
42
Reported by
Rituparna Bora
Contact number
+91 98640 21774
Coordinates
27.7842, 94.2201
CriticalnewMedical2 hr 49 min ago

Keithelmanbi relief camp

KangpokpiManipur

Pregnant woman in obstructed labour and a diabetic patient out of insulin since yesterday. The camp has no vehicle and the NH-2 stretch north of us is under water.

AccessCamp block C, near the water point

People involved
3
Reported by
Thangboi Kipgen
Contact number
+91 70058 41129
Coordinates
24.9214, 93.8876
Criticalteam_assignedLandslide4 hr 9 min ago

NH-306 near Kawnpui slope

KolasibMizoram

Full slope collapse across both lanes. Two vehicles are trapped between the debris and the drop edge. No safe way to reverse out, the shoulder has gone.

AccessKilometre stone 47, hill side of the carriageway

People involved
9
Reported by
Lalrinmawia Ralte
Contact number
+91 90897 55310
Coordinates
24.2417, 92.6738
HighnewRoad blockage5 hr 38 min ago

Sonapur bypass tunnel mouth

Ri BhoiMeghalaya

Boulder fall has closed the Shillong bound carriageway. Roughly forty vehicles queued with no diversion signage. Three are refrigerated medical vans that cannot idle much longer.

AccessJust past the tunnel on the Shillong bound side

People involved
120
Reported by
Wanshanlang Kharkongor
Contact number
+91 87948 30265
Coordinates
25.9051, 91.8842
HighResolvedRoad blockage11 hr 2 min ago

NH-10 at Rangpo check post

PakyongSikkim

Teesta has undercut the river side lane and about twelve metres of road has dropped away. Single file movement only and the crack is widening each hour.

AccessRiver side lane, first hairpin above the check post

People involved
65
Reported by
Tenzing Bhutia
Contact number
+91 94341 67720
Coordinates
27.1772, 88.5342
ModerateResolvedEarthquake1d 5h ago

Tamenglong town centre

TamenglongManipur

Tremor cracked the hospital boundary wall and the first floor corridor. Staff evacuated patients to the forecourt and need structural clearance before moving them back in.

AccessOpposite the district hospital gate

People involved
18
Reported by
Akoijam Sanjita Devi
Contact number
+91 88379 04416
Coordinates
24.9857, 93.5069

Incident feed

Confirmed events across the eight states.

CriticalFlood38 min ago

Brahmaputra embankment breach at Jonai

Jonai revenue circle, Dhemaji, Assam

Roughly sixty metres of embankment gave way shortly after midnight. Water is moving across four revenue villages and the NH-15 approach is under half a metre at the Jonai diversion.

14,200 in affected areaAffectsNH-15District control room
CriticalLandslide2 hr 12 min ago

Slope failure closes NH-306 at Kawnpui

Kilometre stone 47, NH-306, Kolasib, Mizoram

The full slope came down across both lanes and took the shoulder with it. Two vehicles are trapped between the debris and the drop edge with no safe way to reverse out.

340 in affected areaAffectsNH-306State highway patrol
CriticalLandslide3 hr 41 min ago

Boulder fall blocks the Sonapur stretch of NH-6

Sonapur, Shillong bound carriageway, Ri Bhoi, Meghalaya

Loose slope material and two large boulders are across both lanes just past the tunnel mouth. About forty vehicles are queued with no diversion signage in place.

1,800 in affected areaAffectsNH-6Traffic police
HighHeavy rainfall1 hr 14 min ago

Red rainfall warning for the Khasi and Jaintia hills

Sohra and the southern slopes, East Khasi Hills, Meghalaya

Two hundred and forty millimetres recorded in twenty four hours with a further heavy spell forecast overnight. Slope saturation across the southern face is already past the level that preceded the Sonapur failure.

96,000 in affected areaAffectsNH-6NH-6Regional meteorological centre

Highest risk districts

Model output, ranked.

  • Dhemaji, Assam92
  • East Khasi Hills, Meghalaya87
  • Kolasib, Mizoram84
  • Cachar, Assam78
  • Pakyong, Sikkim74

Fleet at a glance

Relief and response vehicles under way.

  • AS 01 KC 4417Relief truck to DibrugarhMoving2 hr 28 min
  • ML 05 T 8820Medical van to ShillongMoving26 min
  • MZ 01 A 2093Fuel tanker to AizawlHeldno eta
  • NL 07 D 1156NDRF convoy to ImphalMoving2 hr 44 min
  • TR 01 G 6604Relief truck to SilcharMoving2 hr 12 min

Road condition reports from the field

Filed by citizens, drivers, field officers and traffic police.

NH-27CautionLow visibility2 hr 23 min ago

Dense morning fog on the bypass

Bongaigaon bypassBongaigaon

Visibility under fifty metres between the toll plaza and the bypass exit. Two minor rear end collisions already reported this morning.

CitizenAwaiting verification
NH-15CautionWaterlogging3 hr 3 min ago

Sheet water over the Kaziranga stretch

Kaziranga north boundaryGolaghat

Around forty centimetres of standing water across roughly two kilometres. Passable for high clearance vehicles only, and animal crossings are heavy at dusk.

Field officerVerified
NH-6ImpassableLandslide5 hr 17 min ago

Debris across both lanes at Sonapur

Sonapur slopeRi Bhoi

Loose slope material came down after the overnight spell. Clearance equipment is on site but the hill face is still shedding.

Traffic policeVerified
NH-2CautionLandslide7 hr 9 min ago

Partial slip narrowing the Maram climb

Maram to SenapatiSenapati

Half the carriageway is under slipped earth. Single file alternating movement is holding but it queues badly against the morning convoy.

Field officerVerified
NH-10ImpassableRoad collapse10 hr 41 min ago

River side lane has dropped away above Rangpo

Rangpo to SingtamPakyong

The Teesta has scoured the embankment. Convoy movement suspended until the geotechnical team signs off on the remaining lane.

Traffic policeVerified
NH-37CautionBridge stress13 hr 27 min ago

Load limit imposed on the Barak crossing

Jiribam to KhongsangNoney

Pier scour measured above the safe threshold. Axle load capped at sixteen tonnes until the next inspection window.

Field officerVerified

Totals on this screen cover 1,56,440 people across 9 districts. Severity bands run critical, high, moderate, low.

Made with Modulify