MARGDARSHAKDisaster aware mobility
SOS

Logistics and vehicle tracking

Relief and response vehicles tracked against the corridor they are on, with exposure raised as soon as the road ahead changes condition.

9 vehicles under way

Vehicles under way

9

of 10 tasked

Held on route

2

Blocked ahead, awaiting clearance

High exposure

5

On degraded or closed corridors

Average time to arrival

1 hr 52 min

1 delivered today

Indicative fleet positions

Plotted along the corridor between origin and destination, coloured by exposure.

Strategic road corridors of the North Eastern Region with current condition of each segmentAS 01 KC 4417, Relief truck to DibrugarhML 05 T 8820, Medical van to ShillongMZ 01 A 2093, Fuel tanker to AizawlNL 07 D 1156, NDRF convoy to ImphalTR 01 G 6604, Relief truck to SilcharAS 11 AC 7731, Ambulance to GuwahatiAR 02 B 3390, Relief truck to ItanagarSK 01 J 0428, Medical van to GangtokMN 01 C 5512, Fuel tanker to ImphalSiliguriGangtokAgartalaGuwahatiShillongAizawlSilcharItanagarDimapurImphalKohima
  • Open
  • Caution
  • Closed

Consignment board

Every tasked vehicle with its cargo and current exposure.

  • AS 01 KC 4417Relief truckHigh exposure

    Guwahati to Dibrugarh

    Tarpaulin, dry ration, water pouches

    62% complete2 hr 28 min to run
    Nripen SaikiaAssam State Disaster Management AuthorityMoving

    Holding the north bank alignment. Diversion at Jonai adds about forty minutes.

  • ML 05 T 8820Medical vanModerate exposure

    Guwahati to Shillong

    Cold chain vaccines, trauma kits

    81% complete26 min to run
    Banrisha LyngdohMeghalaya Health ServicesMoving

    Cold chain within tolerance. Onward leg to Silchar cancelled while Sonapur is closed.

  • MZ 01 A 2093Fuel tankerCritical exposure

    Silchar to Aizawl

    Twelve kilolitres diesel

    34% completeheld, no eta
    Zorampara HnamteMizoram Civil SuppliesHeld

    Stopped short of the Kawnpui slope failure. No safe turning point, holding at the last wide shoulder.

  • NL 07 D 1156NDRF convoyHigh exposure

    Dimapur to Imphal

    Six rescue boats, dewatering pumps, forty personnel

    45% complete2 hr 44 min to run
    Convoy lead, Havildar R LamareNational Disaster Response Force, Second BattalionMoving

    Through the Maram single file section. Kohima control is holding oncoming traffic in ten minute blocks.

  • TR 01 G 6604Relief truckModerate exposure

    Agartala to Silchar

    Family kits, chlorine tablets

    58% complete2 hr 12 min to run
    Sujit DebbarmaTripura Relief and RehabilitationMoving

    NH-8 running clear. Staging point moved to higher ground before arrival.

  • AS 11 AC 7731AmbulanceLow exposure

    Tezpur to Guwahati

    Advanced life support, two paramedics

    27% complete1 hr 38 min to run
    Jadav HazarikaAssam Emergency ResponseMoving

    Cardiac transfer from Tezpur. Green corridor requested through the Jalukbari approach.

  • AR 02 B 3390Relief truckModerate exposure

    Tezpur to Itanagar

    Shelter material, solar lanterns

    12% complete2 hr 52 min to run
    Tana TakorArunachal Pradesh Disaster ManagementRerouted

    Moved off the direct climb after stone fall reports. Now routed through the foothill alignment.

  • SK 01 J 0428Medical vanCritical exposure

    Siliguri to Gangtok

    Blood units, oxygen concentrators

    21% completeheld, no eta
    Pema LepchaSikkim Health DepartmentHeld

    Held at Rangpo check post. NH-10 river side lane has dropped away and no load clearance has been issued.

  • AS 03 FC 2287Relief truckLow exposure

    Guwahati to Tura

    Dry ration, mosquito nets

    100% completedelivered
    Momtaz AliAssam State Disaster Management AuthorityDelivered

    Unloaded at the Tura district store. Vehicle released for the next tasking.

  • MN 01 C 5512Fuel tankerHigh exposure

    Kohima to Imphal

    Fourteen kilolitres petrol

    73% complete44 min to run
    Yumnam RobindroManipur Civil SuppliesMoving

    Priority consignment. Imphal pumps are down to roughly two days of stock.

Made with Modulify