Logistics and vehicle tracking
Relief and response vehicles tracked against the corridor they are on, with exposure raised as soon as the road ahead changes condition.
Vehicles under way
9
of 10 tasked
Held on route
2
Blocked ahead, awaiting clearance
High exposure
5
On degraded or closed corridors
Average time to arrival
1 hr 52 min
1 delivered today
Indicative fleet positions
Plotted along the corridor between origin and destination, coloured by exposure.
- Open
- Caution
- Closed
Consignment board
Every tasked vehicle with its cargo and current exposure.
- AS 01 KC 4417Relief truckHigh exposure
Guwahati to Dibrugarh
Tarpaulin, dry ration, water pouches
62% complete2 hr 28 min to runNripen SaikiaAssam State Disaster Management AuthorityMovingHolding the north bank alignment. Diversion at Jonai adds about forty minutes.
- ML 05 T 8820Medical vanModerate exposure
Guwahati to Shillong
Cold chain vaccines, trauma kits
81% complete26 min to runBanrisha LyngdohMeghalaya Health ServicesMovingCold chain within tolerance. Onward leg to Silchar cancelled while Sonapur is closed.
- MZ 01 A 2093Fuel tankerCritical exposure
Silchar to Aizawl
Twelve kilolitres diesel
34% completeheld, no etaZorampara HnamteMizoram Civil SuppliesHeldStopped short of the Kawnpui slope failure. No safe turning point, holding at the last wide shoulder.
- NL 07 D 1156NDRF convoyHigh exposure
Dimapur to Imphal
Six rescue boats, dewatering pumps, forty personnel
45% complete2 hr 44 min to runConvoy lead, Havildar R LamareNational Disaster Response Force, Second BattalionMovingThrough the Maram single file section. Kohima control is holding oncoming traffic in ten minute blocks.
- TR 01 G 6604Relief truckModerate exposure
Agartala to Silchar
Family kits, chlorine tablets
58% complete2 hr 12 min to runSujit DebbarmaTripura Relief and RehabilitationMovingNH-8 running clear. Staging point moved to higher ground before arrival.
- AS 11 AC 7731AmbulanceLow exposure
Tezpur to Guwahati
Advanced life support, two paramedics
27% complete1 hr 38 min to runJadav HazarikaAssam Emergency ResponseMovingCardiac transfer from Tezpur. Green corridor requested through the Jalukbari approach.
- AR 02 B 3390Relief truckModerate exposure
Tezpur to Itanagar
Shelter material, solar lanterns
12% complete2 hr 52 min to runTana TakorArunachal Pradesh Disaster ManagementReroutedMoved off the direct climb after stone fall reports. Now routed through the foothill alignment.
- SK 01 J 0428Medical vanCritical exposure
Siliguri to Gangtok
Blood units, oxygen concentrators
21% completeheld, no etaPema LepchaSikkim Health DepartmentHeldHeld at Rangpo check post. NH-10 river side lane has dropped away and no load clearance has been issued.
- AS 03 FC 2287Relief truckLow exposure
Guwahati to Tura
Dry ration, mosquito nets
100% completedeliveredMomtaz AliAssam State Disaster Management AuthorityDeliveredUnloaded at the Tura district store. Vehicle released for the next tasking.
- MN 01 C 5512Fuel tankerHigh exposure
Kohima to Imphal
Fourteen kilolitres petrol
73% complete44 min to runYumnam RobindroManipur Civil SuppliesMovingPriority consignment. Imphal pumps are down to roughly two days of stock.